If you want to make sure of that check the concrete temperature using an infrared temperature gun or use maturity methods. Concrete that does not cure properly can shrink crack or even develop a dusty weak and crumbly surface.
Maintain the concrete temperature above 400 degrees fahrenheit for at least four more days after the use of the insulation blankets or heated enclosures.
How long does it take for concrete to cure in 40 degree weather.
Factors affecting concrete setting time.
Typically you only need to keep the blankets on for a couple of days if the concrete is warmer than 500f.
The american concrete institute aci definition of cold weather concreting is a period when for more than three successive days the average daily air temperature drops below 40 degrees fahrenheit and stays below 50 degrees fahrenheit for more than one half of any 24 hour period under these conditions special techniques need to be applied.
Significant overall reductions in strength gain up to 50 can occur if concrete is frozen before it reaches 500 psi.
But to answer the question of how long does concrete take to set concrete setting time is generally 24 to 48 hours.
Since the concrete is setting more slowly in the cold bleeding starts later lasts longer and you can get more bleed water.
Concrete that goes through just one freeze cycle before reaching 500 psi may be restored to nearly normal strength if proper insulatingcuring is done.
The concrete temperature cannot drop more than 400 fahrenheit in 24 hours.
Pouring concrete for fence posts is more difficult in cold weather as freezing temperatures can damage the concrete as it sets up.
Wait at least 24 hours before allowing foot traffic including pets on a newly poured sidewalk or slab and dont drive a vehicle on a new driveway for at least 10 days.
The effect of concrete temperature and retardation of setting time is given by pca in the chart below.
You must take extra precautions to ensure that the concrete stays warm enough to set and harden without freezing.
Average daily air temperature is less than 40 o f the air temperature is not greater than 50 o f for more than one half of any 24 hour period.
The period can be reduced to 3 days if high early strength concrete is used and the temperature is above 10o c 50o f.
To allow concrete to cure correctly keep it wet and warm at temperatures between 50 and 90 degrees fahrenheit for the first week at least.
Most mixes are cured at 28 days.
The longer you allow concrete to cure the harder it becomes.
You can try getting it off with squeegees or vacuums or you can wait.
At this point the neighborhood dog will not leave his footprints in it but you should keep it clear of heavy equipment during this time period.
For most concrete structures the curing period at temperatures above 5o c 40o f should be a minimum of 7 days or until 70 of the specified compressive or flexural strength is attained.
Once the concrete dries it acts as a solid support beneath the ground.
At 40 degrees f concrete could take up to 3 days to reach 500 psi.
Although concrete will harden soon after pouring its still susceptible to damage from weight during the first four weeks.